Firnas Shuman was responsible for the installation and commissioning of two 114 meter self-supporting masts for the plant.

Wind measurement campaign with six 100 meter masts in Azerbaijan
July 22, 2020
One-year Wind Measurement Campaign with Six 80-meter Masts in Ras Ghareb, Egypt
May 15, 2020Firnas Shuman was responsible for the installation and commissioning of two 114 meter self-supporting masts for the plant.