Firnas Shuman was responsible for supply and installation of 6 masts of 100 meters including ultrasonic sensors and winter power supplies for heating sensors for de-icing. Firnas Shuman is responsible for the one year operation of the masts. Firnas Shuman used local partners to help ensure the project schedule was minimally affected by the 2020 COVID-19 pandemic.
![082094 -SN- Grid project pictures-Recovered](https://firnasshuman.com/wp-content/uploads/2020/06/082094-SN-Grid-project-pictures-Recovered.jpg)
Installation of Two 114-meter Self-supporting Masts in Senegal
June 14, 2020Firnas Shuman was responsible for supply and installation of 6 masts of 100 meters including ultrasonic sensors and winter power supplies for heating sensors for de-icing. Firnas Shuman is responsible for the one year operation of the masts. Firnas Shuman used local partners to help ensure the project schedule was minimally affected by the 2020 COVID-19 pandemic.