The customer is planning to build a 50 MW PV plant in Zaafarana, Egypt. Prior to construction, a project of this kind requires a study to identify important data to estimate the potential production of a plant, to design the plant for optimum result and to reduce the uncertainty associated with such projects.
Firnas Shuman has been selected to conduct a bankable solar resource measurement campaign, including supply, installation, operation, and maintenance of a solar meteo-station.
Location: Egypt
Customer: Solar Reserve & TAQA
Year: 2015-2016
Status: Completed
The customer is planning to build a 50 MW PV plant in Zaafarana, Egypt. Prior to construction, a project of this kind requires a study to identify important data to estimate the potential production of a plant, to design the plant for optimum result and to reduce the uncertainty associated with such projects.
Firnas Shuman has been selected to conduct a bankable solar resource measurement campaign, including supply, installation, operation, and maintenance of a solar meteo-station.
Location: Egypt
Customer: Solar Reserve & TAQA
Year: 2015-2016
Status: Completed
Service:
- Supply and install a solar mete-station (including tracking unit and shading apparatus to measure direct, diffuse, and global solar irradiation as well wind speed, direction, ambient temperature, humidity, pressure, temperature of solar modules, and impacts of soiling;
- O&M;
- Data collection and monitoring;