One-year Wind Measurement Campaign with Six 80-meter Masts in Ras Ghareb, Egypt

073295 -EG- Grid project pictures-Recovered
Albedo Measurement Campaign and Analysis in Egypt
April 15, 2020
082094 -SN- Grid project pictures-Recovered
Installation of Two 114-meter Self-supporting Masts in Senegal
June 14, 2020