Firnas Shuman was responsible for the installation and commissioning of two 110 meter guyed masts for power-curve measurement
Technical advisor to the Egyptian Electricity Transmission Co. for 1,500 MW Benban Solar Park
January 11, 2020![Lender’s technical advisor on a portfolio of projects](https://firnasshuman.com/wp-content/uploads/2020/07/049343-EG-Grid-project-pictures-Recovered.jpg)
Lender’s technical advisor on a portfolio of projects
November 16, 2019Firnas Shuman was responsible for the installation and commissioning of two 110 meter guyed masts for power-curve measurement