Firnas Shuman was contracted to install and commission the mast. The mast was inspected by independent 3rd party inspectors and passed inspection.
![059713 -MA- Grid project pictures-Recovered](https://firnasshuman.com/wp-content/uploads/2019/06/059713-MA-Grid-project-pictures-Recovered.jpg)
Commissioning Engineer for 72 MW PV Plant in Morocco
June 11, 2019![066394 -EG- Grid project pictures-Recovered](https://firnasshuman.com/wp-content/uploads/2019/03/066394-EG-Grid-project-pictures-Recovered.jpg)
One-year Measurement Campaign for a 500 MW Wind Farm Using Five 80-meter Masts in Egypt
March 14, 2019Firnas Shuman was contracted to install and commission the mast. The mast was inspected by independent 3rd party inspectors and passed inspection.