The project is a 50 MW Ilanga CSP project with storage and direct water supply from nearby river, developed as part of South Africa’s Renewable Energy Bidding (REBID). The project includes molten salt storage for power generation at night. Lender’s due diligence and engineering review is required as part of the consideration for finance.
Location: South Africa
Customer: Sargent and Lundy/ Development Bank of Southern Africa (DBSA)
Year: 2012
Status: Completed
The project is a 50 MW Ilanga CSP project with storage and direct water supply from nearby river, developed as part of South Africa’s Renewable Energy Bidding (REBID). The project includes molten salt storage for power generation at night. Lender’s due diligence and engineering review is required as part of the consideration for finance.
Location: South Africa
Customer: Sargent and Lundy/ Development Bank of Southern Africa (DBSA)
Year: 2012
Status: Completed
Firnas Shuman team was responsible for in-country technical and economic due diligence, including:
- reviewing site location, output and transportation logistics;
- reviewing the environmental and social impacts and reporting on-site observations;
- studying grid connection and permitting status;
- supporting the design and engineering review.