The project was a 200 MW Wind farm that the client was planning to build in the Gulf of Suez Area. The scope on this contract involves a detailed feasibility study, resource assessment and conceptual design. Firnas Shuman was a joint venture partner with DNV GL on this project.
Location: Egypt
Customer: New and Renewable Energy Authority (NREA)
Year: 2015-2016
Status: Complete
The project was a 200 MW Wind farm that the client was planning to build in the Gulf of Suez Area. The scope on this contract involves a detailed feasibility study, resource assessment and conceptual design. Firnas Shuman was a joint venture partner with DNV GL on this project.
Location: Egypt
Customer: New and Renewable Energy Authority (NREA)
Year: 2015-2016
Status: Complete
Firnas Shuman scope of work has been the following::
- All resource measurement;
- Conceptual design;
- Site evaluation;
- Surveying and geotechnical work;
- Civil design;
- Support of grid assessment;
- Review of environmental requirements.