Firnas Shuman team provided:
- Supply and installation of one permanent mast;
- Rental of two masts for power curve measurement;
- Dismantling the power curve measurement masts on-schedule to allow installation of the wind turbines.

Site Evaluation for 100-meter Mast in Mozambique
October 14, 2018
Installation and Commissioning of a 90-meter Wind Mast in Mauritius
January 11, 2019
Location: Jordan
Customer: DNV GL/ General Electric
Year: 2017
Status: Completed

Location: Jordan
Customer: DNV GL/ General Electric
Year: 2017
Status: Completed