Wind Resource Measurement Campaign with Two 80-meter Wind Masts in Gabal El-Zayt, Egypt
April 25, 2016Supply, installation, commissioning and O&M of 80-meter mast for wind resource measurement in Ras Ghareb, Egypt
February 25, 2016
The project extracts methane from the waters of Lake Kivu and uses the gas to generate electricity. The generated power is fed to the Rwandan grid operated by the Rwanda Electricity Group (REG). Phase 1 of the project, with capacity of 25 MW, started commercial operation in December 2015. The project was developed under a concession agreement made with the Government of Rwanda in 2009. The extraction of the estimated 60 billion cubic meters of methane gas trapped under Lake Kivu and converting that gas into electricity has not been done on a large commercial scale before.
Location: Rwanda
Customer: Sargent and Lundy/ Contour Global/ Rwanda Energy Group (REG)
Year: 2015-2016
Status: Completed
The project extracts methane from the waters of Lake Kivu and uses the gas to generate electricity. The generated power is fed to the Rwandan grid operated by the Rwanda Electricity Group (REG). Phase 1 of the project, with capacity of 25 MW, started commercial operation in December 2015. The project was developed under a concession agreement made with the Government of Rwanda in 2009. The extraction of the estimated 60 billion cubic meters of methane gas trapped under Lake Kivu and converting that gas into electricity has not been done on a large commercial scale before.
Location: Rwanda
Customer: Sargent and Lundy/ Contour Global/ Rwanda Energy Group (REG)
Year: 2015-2016
Status: Completed
Firnas Shuman team provided all in-country services as independent engineer for performance test witnessing, including:
- review of performance test procedure;
- witness of performance tests;
- review of performance test results and calculation;
- issuance of performance test certificate.