Independent Engineer (IE) Conducting Due Diligence Review on Behalf of Lenders for 50 MW Concentrated Solar Power (CSP) Plant with Molten Salt Storage in South Africa
April 11, 2012Independent Engineer (IE) Conducting Due Diligence Review on Behalf of Lenders for 60 MW Solar PV Power Plant in South Africa
March 7, 2012
The project is a 27 MW wind power plant located in Beaufort West, South Africa. Lender’s due diligence and engineering review is required as part of the consideration for finance.
Location: South Africa
Customer: Sargent and Lundy/ Standard Bank/ Metrowind
Year: 2011
Status: Completed
The project is a 27 MW wind power plant located in Beaufort West, South Africa. Lender’s due diligence and engineering review is required as part of the consideration for finance.
Location: South Africa
Customer: SargenSargent and Lundy/ Standard Bank/ Metrowind
Year: 2011
Status: Completed
Firnas Shuman team was responsible for in-country technical and economic due diligence, including:
- reviewing site location, output and transportation logistics;
- reviewing the environmental and social impacts and reporting on-site observations;
- studying grid connection and permitting status;
- supporting the design and engineering review.